How Long Does a Kitchen Remodel Really Take?
- Antonio Aversa
- 12 minutes ago
- 8 min read

The first question most home-owners get once they start seriously considering a kitchen remodel is how long it's gonna take to complete. It's only natural, since most households can't function for long without a working kitchen.
Here's the thing about kitchen remodels: they almost always take longer than homeowners expect, even when contractors give realistic estimates. There are so many moving parts, so many things that need to happen in sequence, and so many opportunities for delays that have nothing to do with your contractor working slowly. Between planning, ordering materials, demolition, construction, inspections, and installation, weeks add up quickly.
Let's talk realistically about how long kitchen remodels take, what affects the timeline, and how to survive without a functioning kitchen for the full duration of your remodel.
The Planning Phase: Before Construction Even Starts
Most people don't count planning time when they think about how long a remodel takes, but it's a real part of the timeline.
Initial planning and design: If you're working with a kitchen designer or going through multiple design iterations with your contractor, this phase can take weeks or even a couple months. You're making decisions about layout, materials, finishes, appliances. Some people move through this quickly. Others agonize over every choice.
If you come to your contractor with designs already finalized and all materials selected, this phase is short. If you're starting from scratch with just ideas, factor in time for design development.
Permit application and approval: Most kitchen remodels require permits, especially if you're moving plumbing, adding electrical, or doing structural work. Submitting permit applications and waiting for approval adds time before work can start. This varies dramatically by location. Some South Jersey towns approve permits quickly. Others take weeks.
You can't control permit approval timelines beyond submitting complete, accurate applications. Your contractor should know typical timeframes for your area.
Ordering materials: Once you've selected cabinets, countertops, appliances, and fixtures, they need to be ordered. Lead times vary enormously. Some items ship quickly. Custom cabinets might take weeks to months. Stone countertops need to be templated (which can't happen until cabinets are installed) and then fabricated.
Material delays are one of the biggest timeline factors. If your cabinets are delayed by several weeks, your entire project timeline shifts.
A Realistic Kitchen Remodel Timeline
Timelines vary enormously based on project scope, but here are general ranges for different types of kitchen remodels.
Minor refresh with no layout changes: Painting cabinets, new countertops, backsplash, maybe new appliances and fixtures. Working within the existing footprint with no plumbing or electrical moves. This might take one to three weeks of actual construction time.
Standard remodel with some layout changes: New cabinets, countertops, flooring, backsplash, appliances. Possibly moving some elements or adding an island. Electrical and plumbing work but nothing too extensive. Actual construction typically takes several weeks to a couple months.
Major remodel with significant changes: Changing the entire layout, moving or adding major plumbing, extensive electrical work, possibly removing walls or other structural work. New everything. Construction alone often takes a couple months or more.
Full gut with structural changes: Removing everything down to studs, moving walls, significantly reconfiguring plumbing and electrical, high-end custom everything. These projects can take several months of construction.
These are ranges, not guarantees: Every project has unique factors. Your specific timeline depends on scope, complexity, material lead times, contractor schedule, inspection timing, and inevitable surprises.
What Actually Happens During Construction
Understanding what work needs to happen and in what order helps explain why kitchens take as long as they do.
Demolition and prep: The existing kitchen comes out. Cabinets, countertops, appliances, flooring, sometimes tile and backsplash. Debris gets hauled away. This might take a few days to a week depending on scope. The space needs to be completely cleared before new work begins.
Rough-in work for plumbing and electrical: New water lines, drain lines, electrical circuits, outlets, switches. This work happens before walls close up. It requires coordination between plumbers and electricians. Rough-in inspections must pass before proceeding. This phase might take a week or two.
Structural work if needed: If you're removing walls, installing beams, or doing other structural modifications, this happens early in the process. Structural inspections are required.
Closing up walls and ceiling work: Drywall, mudding, sanding, priming, painting. Ceilings get finished. This takes time and includes drying time between coats.
Flooring installation: New flooring goes in before cabinets in most cases. Flooring type affects timeline. Some materials install quickly. Others require more time. Flooring also might need time to acclimate before installation.
Cabinet installation: Once floors are done, cabinets get installed. This is meticulous work that can take several days to over a week depending on kitchen size and complexity. Cabinets must be perfectly level and properly secured.
Backsplash installation: Tile or other backsplash materials go up after countertops. Tile work takes time and includes grout drying time.
Final electrical and plumbing: Installing appliances, connecting plumbing fixtures, installing light fixtures, outlets, and switches. Final inspections happen at this stage.
Touch-up and final details: Caulking, paint touch-ups, hardware installation, final cleaning. Making everything perfect.
Each of these phases happens sequentially. You can't skip ahead, so the timeline is partly about how long each phase takes and partly about waiting for one phase to complete before starting the next.
Factors That Speed Up the Timeline
Some things help kitchen remodels move faster, though "fast" is relative.
Simple scope with no layout changes: Keeping everything where it is simplifies plumbing and electrical work dramatically. Less complexity means faster completion.
All materials ready before starting: If everything is ordered, delivered, and onsite before construction begins, you're not waiting for deliveries mid-project. This requires advance planning and storage space.
Minimal customization: Standard sizes, stock cabinets, straightforward layouts. Less custom work means fewer complications and shorter material lead times.
No surprises during demolition: When walls open up and everything is as expected with no hidden problems, work proceeds smoothly. Surprises add time.
Available contractor schedule: If your contractor can dedicate focused time to your project without juggling multiple jobs, work progresses more consistently.
Prompt decision-making: When contractors need homeowner decisions or selections, quick responses keep things moving. Delays in decision-making extend the timeline.
Smooth inspections: Inspections that pass on first try versus requiring corrections and re-inspections affect timeline.
Factors That Slow Things Down
Understanding what causes delays helps set realistic expectations.
Material delays are extremely common: Cabinets backordered, appliances out of stock, countertop fabrication taking longer than expected. Material delays are often the single biggest timeline disruptor and they're largely outside your contractor's control.
Permit and inspection delays: Waiting for permit approval, scheduling inspections, waiting for inspectors to show up, corrections required after inspections. All of this adds time.
Discovery of problems: Opening walls reveals water damage, outdated wiring, structural issues. Addressing these unexpected problems adds time to the project.
Weather delays: If demolition debris needs to be hauled or deliveries need to happen during bad weather, this can cause delays. Some installation work is sensitive to temperature and humidity.
Homeowner decision delays: Changing your mind mid-project, not being available for required decisions, or asking for changes all extend the timeline.
Complexity of work: Custom elements, intricate tile patterns, challenging layouts, all of these require more time than straightforward installations.
Subcontractor coordination: Kitchen remodels require multiple trades. Coordinating schedules among plumbers, electricians, tile setters, countertop fabricators, flooring installers, and general contractors means sometimes waiting for the right person to be available.
Living Without a Kitchen: The Practical Side
The duration of your kitchen remodel determines how long you're without a functional kitchen. Planning for this makes the process more bearable.
Setting up a temporary kitchen: Many families create makeshift kitchens elsewhere in the house. A folding table, microwave, toaster oven, coffee maker, and cooler with ice can handle basic needs. Some people set this up in a dining room, basement, or garage.
Paper plates and disposable utensils eliminate dish washing needs when you have no sink.
Meal planning strategies: Stock up on foods that require minimal cooking. Microwave meals, sandwiches, salads, things you can prepare without a stove. Plan to eat out more than usual. Budget for increased takeout and restaurant expenses.
Some families meal prep before the renovation and freeze portions to reheat. Others embrace the eating-out lifestyle for the duration.
Managing cleanup: Without a kitchen sink, cleaning up becomes challenging. Some people wash dishes in bathroom sinks. Others use disposable items exclusively. Think through hygiene and cleanup logistics.
The mental adjustment: Not having your kitchen is more disruptive than most people anticipate. Your routines get thrown off. It's inconvenient and sometimes frustrating. Accepting this as temporary helps maintain sanity.
Consider timing: If possible, schedule kitchen remodels for times that work with your lifestyle. Summer when kids are out of school and eating schedules are relaxed. Not during major holidays when you'd want to cook big meals.
How to Know If Your Timeline Is Reasonable
When your contractor gives you a timeline, how do you know if it's realistic or padded?
Detailed project schedule: A good contractor provides a detailed schedule breaking down phases. Vague timelines like "it'll take a couple months" are less reliable than specific schedules showing when each phase happens.
Accounting for material lead times: Realistic timelines include time for ordering and receiving materials, not just construction time. If cabinets take eight weeks, that's in the timeline.
Contingency time included: Smart contractors build buffer time for inevitable delays. This isn't padding, it's being realistic about how projects work. Timelines with no contingency are optimistic to the point of unrealistic.
Comparison with similar projects: Ask your contractor about typical timelines for projects like yours. If their estimate is wildly different from what's typical, ask why.
Get multiple estimates: If several contractors give similar timelines and one is dramatically different (faster or slower), the outlier needs to explain their reasoning.
Beware of promises that seem too good to be true: If one contractor promises to complete in half the time others estimate, be skeptical. They might be underestimating, inexperienced, or planning to rush the work.
Trust experience: Contractors who've done hundreds of kitchens can estimate timelines based on real experience. New contractors might be overly optimistic.
When Delays Happen
Despite best efforts, delays occur in almost every renovation. How your contractor handles them matters more than avoiding them entirely.
Communication is critical: Contractors should tell you about delays as soon as they know, explain why, and give updated timelines. Ghosting or avoiding difficult conversations is unacceptable.
Some delays are controllable, others aren't: Your contractor controls their scheduling and work pace. They don't control manufacturer delays, permit office timelines, or weather. Understanding what's within their control helps you assess the situation.
Adjustment and flexibility: Some flexibility on both sides helps. If your contractor hits an unexpected delay but communicates well and adjusts the plan, that's reasonable. If delays keep happening without explanation or adjustment, that's a problem.
When to be concerned: Repeated delays with poor communication, contractor not showing up as scheduled, work quality suffering due to rushing, these are red flags. Delays paired with good communication and problem-solving are more acceptable.
The Bottom Line on Kitchen Timelines
Kitchen remodels take longer than most homeowners wish they did. Even quick projects rarely complete in less than a few weeks. Standard remodels take weeks to a couple months. Extensive renovations take several months.
The timeline includes much more than just work happening in your kitchen. Materials need ordering and delivery. Permits require approval. Work happens in phases that can't overlap. Inspections need scheduling. Everything takes longer than it seems like it should.
Realistic expectations help you plan and reduce frustration. A contractor who gives you a longer, realistic timeline and meets it is better than one who promises quick completion and runs over schedule.
Your kitchen remodel will eventually be done. The disruption is temporary. The result lasts for years. Having patience with the process leads to better outcomes than trying to rush through it.
Let's Give You a Realistic Timeline
Planning a kitchen remodel and want to understand what timeline is actually realistic for your project? We'd be happy to discuss your scope and give you an honest assessment of how long it'll take and what factors might affect the schedule.
Call or text us at 609-233-6617, or send us a DM to schedule your free consultation.